Job Bill of Materials Record

Edit

Job Bill of Materials

Quote LineDWG ReferenceCustom MK NumberClassDescriptionUnit MeasureQuantity PerQuantity TotalQ FactorLengthWidthFeet TotalLBS TotalCost RAWCost OtherPhaseHoursOPPLOPPL1 Hours
1A-101MK-4HSSHSS 4x4x.250FT1121.0204240768$1,920.00$80.00Fab6.0OP-11.5
Total — — — — — — 12 — — — 240768$1,920.00$80.00 — 6.0 — 1.5

Job Bill of Materials Summary

Part Number HitsSum LBS TotalSum Quantity TotalSum Feet TotalCost Feet EachTotal BOM CostSum ClassSum DescriptionSum LBS Per FootLBS Cost StandardLBS Cost QuantityFoot Cost QuantityEstimated Cost QuantityQuoted Information
121,84048620$1.25$7,750.00HSSTube3.2$0.85$1,564.00$775.00$7,750.00RFQ-441
Total1,84048620 — $7,750.00 — — — — — — — —