Estimate Record

Edit

Estimate Information

000001
Sent
2026-07-20
2026-08-05

Jane Smith
000001
Open
18400

RFQ-441

Customer Information

Prairie Steel Ltd
CUST-1001
123 Prairie Ave
Saskatoon

Saskatchewan
Canada
S7K 1A1

Estimate Description

Mezzanine framing package for Prairie Steel.

Estimate Summary

$7,750.00
28%
$2,170.00
$9,920.00

$45.00
86
$3,870.00
$85.00

$3,440.00
$7,310.00
6
$405.00

$195.00
6
$405.00
$120.00

$315.00
$720.00
$12,025.00
32%

$5,725.00
$17,750.00
1,840
48

38.3
1.79
21.4
$9.65

$4.21
$5.44

Estimate Bill of Materials Summary

Part Number HitsSum LBS TotalSum Quantity TotalSum Feet TotalCost Feet EachTotal BOM CostSum ClassSum DescriptionSum LBS Per FootLBS Cost StandardLBS Cost QuantityFoot Cost QuantityEstimated Cost QuantityQuoted Information
121,84048620$1.25$7,750.00HSSTube3.2$0.85$1,564.00$775.00$7,750.00RFQ-441
Total1,84048620 — $7,750.00 — — — — — — — —

Estimate Bill of Materials

Quote LineDWG ReferenceCustom MK NumberClassDescriptionUnit MeasureQuantity PerQuantity TotalQ FactorLengthWidthFeet TotalLBS TotalCost RAWCost OtherPhaseHoursOPPLOPPL1 Hours
1A-101MK-4HSSHSS 4x4x.250FT1121.0204240768$1,920.00$80.00Fab6.0OP-11.5
Total — — — — — — 12 — — — 240768$1,920.00$80.00 — 6.0 — 1.5